شرکت فرآیند کنترل نقش جهان (سهامی خاص)

مشاوره و سفارش
English Language
Instagram Whatsapp
arm-farayandfav

شرکت فرآیند کنترل نقش جهان Farayand Control Co

مشاوره ، طراحی و نظارت انواع شبکه های مخابراتی و انفورماتیکی

  • خانه
  • درباره
  • خدمات
  • پروژه ها
  • تماس با ما
  • اخبار

HomePortfolio projects

projects

تابلو-کنترل-و-تابلو-اندازه-گیری-فیدر-63-کیلوولت

Optimization and replacement of CT and installation of switchboard at 63 KV level of Isfahan regional power station

projects
unnamed

Repairs and maintenance of telephone and VoIP centers of Isfahan Province Electricity Distribution Company

projects
bargh

Installation and commissioning of the solar system and stabilization of the power supply of the wireless repeaters of Isfahan Regional Electric Company

projects
6948624_986

Launching the SCADA system and telecommunication links to online the distribution stations of the Isfahan, Chaharmahal and Bakhtiari regional electricity networks.

projects
slide03

Design, installation, testing and commissioning of the 400 KV SCADA post and telecommunication system in Chaharmahal and Bakhtiari Sefidasht Steel Company.

projects

نوشته‌های تازه

  • Application Of Array Antenna In “Femtocell” Of Fifth Generation Mobile Wireless Telecommunication Networks
  • کاربرد آنتن آرایه‌­ای در «فمتوسل» شبکه­‌های مخابراتی بی­‌سیم نسل پنجم موبایل

آخرین دیدگاه‌ها

    به جمع ما بپیوندید

    ایمیل خود را برای دریافت آخرین اخبار وارد کنید

    logo

    شرکت

    • صفحه اصلی
    • درباره ما
    • تماس با ما

    تماس

    • 00983137763450
    • 00983137759819
    • info[at]fcn-co.com

    آدرس

    اصفهان – بلوار شفق – خیابان نیروگاه

    ساختمان  معاونت  بهره  برداری

    طراحی و اجرا انیاک | تمام حقوق برای شرکت فرآیند کنترل نقش جهان محفوظ است © 1404
    Instagram Whatsapp Linkedin Twitter
    زنبیل خرید